Saturday, November 26, 2016

Fremo AmericaN meeting in Bremen Germany

Recently I went to the Fremo AmericaN meeting in the northern German city of Bremen. The trip took some doing as both halves of the train trip resulted in delays. A signalbox failure in Deventer in the Netherlands on the outbound trip meant my planned route had to be changed. On the return trip there were engineering works in the Netherlands on my route and I had to take a replacement bus. As luck wouyld have it, the one on my route was a local bus stopping at all stations and on the other route it was a fast bus. Oh well.
Luckily both NS and DB were very helpful and no additional costs were incurred. Only time delays and they were compensated by new train routes I travelled.

This meeting was the first time we tried out timetable and trainorder operation. While we had some problems I feel we can overcome them with more familiarity with the procedures. It helps of course when yours truly pays attention to the switching and makes it efficient. Oh well, live and learn, right? I had great hopes for this type of operation which is a bit difficult to do on ever changing modular setups. I was pleasantly surprised by the easy with which everyone adapted to it. Normally we use track warrant control or no dispatcher in our meetings. 

See here for the report, here for a plan of the modular layout and here for Hagen Langbartel's picsYou can even see me in some of the pictures...

Thanks to all who made it possible to have a great time despite coming down with the flu.


Monday, October 17, 2016

A nice moveable workbench

Earlier in the year I lamented that I needed a better work environment. Fast forward to 2 weeks ago and up again pops this video on youtube after a few years.  I'm still interested in it and have asked a woodworking good friend of my parents for advice. I want different wheels so I can more easily drag it up the stairs as the place where i want to use it, living room and balcony, are 1 story higher than where it will usually reside when it is between duties.



More info including the price for the drawings can be found here.

Sunday, September 11, 2016

The best laid plans...

often go awry. So did mine once spring was underway. A laptop that stopped working just hours before I was going to make a backup (a lesson there, make backups first, not last) meant I lost access to the drawings of the module of G&M Junction I'm working on. That said me back some, including thinking about continuing with modifying existing modules versus starting from scratch. But money isn't all that more plentiful.

Further, my mental and physical health took a nosedive. Got out of that okay but it took quite a bit of scarce energy, including in therapy sessions. Then I started a 2 day a week volunteer job at the local maritime museum. That takes a lot of energy, a hell of a lot, but it gives me back much too since this is the first time I've been able to work in 5 years.

And now we have a hot late summer with temperatures around 30C which means much of that heat lingers on for days afterwards in my top level corner appartment with walls on the east, south and west sides...

But I found my interest in model railroads again so we will see what I can do next. I can certainly use the diversion from my health problems that might get worse in the coming months due too an incompetent doctor no longer prescribing medication that barely worked anyway.

So, onwards we soldier even if it has to be done without being able to go full steam ahead.  

Wednesday, March 9, 2016

Blood, sweat and sawdust

Today I completed the sawing apart of the modules that will form the core of G&M Junction. Last weekend the batteries of my drill had run empty drilling holes for the jigsaw and by the time they were charged again it was too dark and too cold.
I had some problems today which surprised me a bit. It turned out it was more difficult to make a vertical cut through the horizontal piece of plywood that forms the top than I expected. Wasted 2 sawblades on it. Also, the plywood has internal layers that are much harder than the outer onces, complicating matters. I didn't manage to saw in a straight line but that isn't as much of a problem I hope as it sounds as there will be new endplates that have to be affixed to the sawcut.

Also, some nails vibrated loose and I didn't see one in time so I opened the skin of a thumb on one. Needless to say the offending pieces of metal are now history...

I layed out the pieces on my balcony as I intend to use them and used the parts that once where the lower half as stand in for the new segments. I will try to use those pieces first before I build new segments. Money is scarce so it's worth a try.

To do:
- buy and attach new endplates.
- concurrent with the above, remove some material from existing endplates.
- remove material from the sides.
- track and electrics.
- remove material from the top plate where the tracks won't be.
- build the (boring) scenery: a few trees, a road crossing the railroad and another paralleling it and lots and lots of corn and grassy fields mainly.

Oh, and find a way to upload the pictures I took so you all get an idea what I'm talking about. Can't find the software that came with my digital camera (bought it all the way back in december 2008) and I have never used it on this laptop...

Lessons learned:
- 9 mm plywood is plenty strong enough, these modules were build back in 2009 and were otherwise still sound, despite being stored on their endplates since 2011 and my less than perfect construction methods.

- Pay attention when buying plywood. Hardwood is HARD.

- I need a better work environment when working on large items or doing rough work like sawing.

- SAFETY FIRST! I need to buy new safety glasses as I couldn't find the ones I have and flying sawdust is no fun. Not to mention things that could have happened with a nail coming loose enough to fly away.

- And yes, old modules CAN be taken apart and the parts rearranged to make a different module.

- I CAN DO IT

Saturday, March 5, 2016

I started G&M Junction

De kop is er af, that is what we say in Dutch if we have started something, literally the head is off. No pictures yet but the first Fremo america-N module is now on a diet and has had the bottom half taken off. The ony reason the other module hasn't been done to that state yet is the fact that I ran out of battery power so couldn't drill more holes so the jigsaw could be used.

The lower half weighs ~700 grams and the top hald still weighs ~2100 grams.

Still to do:
- cutting at a diagonal
- remove more material to save even more on weight, including on top as the modules had a plate on top.
- New ends
- extra support for when I'm cutting through the top plate.
- glue polystyrene to the sides to hide the holes and less than perfect sawcuts.

And of course to lay track, wire everything and build the landscape. But those are other stages. 

Oh well, tomorrow is another day for doing a little bit.

Wednesday, March 2, 2016

Todos los dias un poco

Every day a little bit isn't just my motto for this year but I actually try to live by it. Today I put up 2 segments of an Ikea Ivar 30 cm deep storage system. Looking at the planks I put in somewhat randomly, I decided to measure the heigth. Turns out the levels are as follows:
- 50 cm
- 82 cm
- 114 cm
- 146 cm
- 180 cm

Both standing, 114 & 146 cm and seated, 82 & 114 cm, the levels were visibe. The 30 cm difference in heigth was pleasing. However, there is a connection between the posts at 119 cm so in practice the 114 cm level would have to be 120 cm high.

More tryouts are of course needed, including both trains and mockups of modules made out of cardboard. But a beginning for a homelayout in whatever shape it will take is there.


Sunday, February 28, 2016

Reusing old Fremo americaN modules

Was doing some work in the second bedroom in preparation for building a home layout when I was reminded of all the old modules I have. So I went to my storage area and looked at them for some time. Got some ideas rumbing in the back of my mind now.


CGW in Dubuque county Iowa

One idea is to reuse a 1 meter long and way to heavy module and cut it in three smaller sections. By making the cuts at a slight angle and turning the middle section around it should be possible to make a module with a curve in it. As for a theme, I have long been fascinated by an area on the CGW, just west of Dubuque Iowa, where the railroad follows the Little Maquoketa river. There is a palisade like stretch and even a free standing rock named Split Rock. Don't know if it is natural or manmade but it seems a nice theme for a module where you look at it from the inside of the curve. In the 1970s the track was removed. Now it is a trail known as the Heritage Trail.

The wooded palisades could be made removable and stored under / inside the segments that would be screwed together in the original shape to facilitate transportation by public transport.








M&STL Adelaide

The M&StL Adelaide station was a very simple affair, 1 switch. The station was the first station west of the junction at Conde on the line to LeBeau on the Missouri river in South Dakota. Today you can't 
I have 2 Fremo americaN modules that are 50 cm long. Originally they were to be modules portraying single track going to double track but I gave up on that.
Seems to me that since the modules stacked together form a compact unit and since Adelaide had virtually no buildings beside 2 elevators that likely can be stored under / inside a segment, it is an ideal candidate for a Fremo americaN module!






Today there isn't even a trace of this town that didn't even got off the ground. It was located in southwestern Beotia township in Spink county, roughly where it says abandoned next to the border of sections 31 and 32.







Saturday, February 13, 2016

Caught - update on planning G&M Junction

Caught the flu before the holidays and can't quite get rid of it. The design for the G&M modules is nearly finished but I haven't gotten around to start cutting them up. I keep finding little things I've overseen and I can only cut them up once...

This is the situation right now. 


I will probably turn the module with the Interstate bridge around if I want it to be prototypical but keep it this way as this gives more of a curve for Fremo America-N layout planners. The scenery will most likely also be made as puzzle scenery. This means that most of the scenery but not the track will be separate pieces. In this way I can model the Interstate bridge in more modern times but with fields in a 1950's session.

All module ends will be conform the Fremo America-N standard though likely some centimeters 'higher' (actually below the usual 10 cm to cater for the new much thinner sections being stored below them during transport to save on volume) than the usual 10 cm.

From any module end there will first be 5 cm of straight track to mitigate potential problems when coming from an adjoining module before any curves start. It's been my experience that if an adjoining module has the curve right up to the end of the module this gives problems if the next module starts with a turnout. Even if the turnout and the curve are curving in the same direction.
A curve, a switch and two modules connecting is one thing too many. I would make it at least 10 cm but that gave too much problems.


Sunday, January 17, 2016

Planning, planning, planning

Still planning this module. The flu and the holidays interfered but I'm back on track. I think I have the final idea on how to cut up the two modules and rearrange them, together with 2 extra segments.

I wanted to have the curve south of G&M junction as a separate module but it is so close to the junction that that does not seem advisable. Instead, the two segments will form a module that can have the I-80 overpass or the situation before that, just to the north of the junction. All depending on the timeframe of the operating session at a Fremo America-N meeting.