Sunday, January 17, 2016

Planning, planning, planning

Still planning this module. The flu and the holidays interfered but I'm back on track. I think I have the final idea on how to cut up the two modules and rearrange them, together with 2 extra segments.

I wanted to have the curve south of G&M junction as a separate module but it is so close to the junction that that does not seem advisable. Instead, the two segments will form a module that can have the I-80 overpass or the situation before that, just to the north of the junction. All depending on the timeframe of the operating session at a Fremo America-N meeting.